Data Center Construction October 2, 2026

Six Ways Klover Brings Certainty to Data Center Construction

Data center construction is moving at a pace few sectors of commercial construction can match. Massive facilities, aggressive turnover schedules, skilled labor demands and increasingly complex coordination create a fundamental challenge for owners and general contractors: How do you build faster without sacrificing safety, quality or certainty?

At Klover, we believe part of the answer is determining what work can be moved off-site, coordinated earlier and installed more efficiently in the field. Our approach to data center construction brings together prefabrication, cold-formed steel framing, BIM and design-assist, manufacturing, and experienced field construction.

Rather than applying one solution to every project, Klover works with general contractors, engineers, designers and project teams to understand the building, identify constraints and determine the construction approach that makes the most sense.

Here are six ways Klover supports mission-critical and data center construction.

1. Prefabricated Data Center Enclosure Systems

Getting a data center enclosed and dried-in is more than another construction milestone. The enclosure connects structural construction with the work that needs to happen inside the building, making exterior assembly an important part of critical-path planning.

Klover moves labor-intensive exterior wall construction into a controlled manufacturing environment through prefabricated enclosure systems. Wall assemblies can be coordinated and manufactured off-site, then delivered for installation, reducing the amount of assembly required in the field.

For data center developers and general contractors facing aggressive schedules, the objective is to reduce field labor, accelerate enclosure and help create the conditions for critical downstream activities to begin sooner.

2. Cold-Formed Steel and Bypass Framing

Data centers can present significant framing challenges. On large, multi-story mission-critical facilities, structural requirements, building dimensions and aggressive schedules place added demands on the exterior wall system. Klover provides cold-formed steel and bypass framing solutions designed around each project’s structural, architectural and constructability requirements.

Cold-formed steel also plays an important role in Klover’s broader prefabrication strategy. By combining framing expertise with BIM, engineering coordination and off-site manufacturing, Klover helps project teams evaluate where field-built framing assemblies can be transformed into manufactured systems.

The goal is to develop a construction solution around the specific requirements of the building.

3. Interior Prefabrication and Kitted Wall Systems

Prefabrication opportunities do not end when the exterior enclosure is complete. Klover applies off-site construction methods to data center interiors through prefabricated wall assemblies, componentized framing and kitted wall systems. These approaches can reduce the measuring, cutting and layout required in the field.

Two Klover team members at the manufacturing facility

Site access and logistics can make it impractical to transport a fully assembled wall into certain areas. In those situations, Klover can coordinate and manufacture individual components at its facility. Framing can be pre-cut, labeled, organized and bundled with assembly information before delivery.

Field crews can then focus on efficient assembly and installation rather than starting with raw material. This lets data center teams capture many of the advantages of prefabrication even when a completed panel is not the right solution.

4. BIM, Design-Assist and Engineering Coordination

Successful data center prefabrication begins well before material reaches Klover’s manufacturing facility. Klover’s in-house BIM and design teams work with general contractors, engineers and project stakeholders to coordinate framing, panel dimensions, structural requirements, penetrations, interfaces and installation sequencing around how the building will be manufactured and constructed.

This coordination helps teams identify constructability challenges earlier, when they can be addressed digitally rather than discovered during fabrication or field installation.

For Klover, BIM is more than a visualization tool. It connects design intent with engineering, manufacturing, logistics and installation, creating a coordinated path from the model to the shop and ultimately to the field.

5. Field Installation and Interior Construction

Off-site manufacturing does not eliminate the need for experienced people in the field. Klover combines prefabrication with skilled field carpenters, installation crews and site leadership.

Its capabilities range from prefabricated panel installation and cold-formed steel framing to conventional interior framing and drywall construction, allowing Klover to support a broad range of data center scopes.

Having both manufacturing and field construction capabilities also lets Klover evaluate a project from both perspectives. Not every component should be prefabricated, and a complete panel is not always the most efficient answer. Depending on the building, schedule and logistics, the right solution could be a prefabricated assembly, a kitted system, an off-site manufactured component or conventional field construction.

The objective is to determine which approach creates the greatest value for the project.

6. Critical-Path and Labor Optimization

Large-scale data center construction can require significant field manpower to meet demanding turnover schedules. Larger crews can also increase demands for supervision, safety personnel, cleanup, logistics and other field resources. Workforce planning is therefore an important part of the overall construction strategy.

Klover evaluates projects to identify work that can be prefabricated, componentized, kitted or otherwise shifted into a controlled manufacturing environment. Moving appropriate activities off-site can reduce field manpower while allowing crews to concentrate on installation and production. This can help contractors address workforce constraints, support safety and protect critical construction milestones.

The goal is not simply to perform one scope faster. It is to understand how that scope connects to the larger construction schedule and help the project reach its next critical milestone with greater predictability.

A Data Center Construction Partner Focused on Problem-Solving

Klover’s data center capabilities grew from solving real construction challenges alongside general contractors, designers and engineers. That collaborative approach continues to shape how the company works.

What began with prefabricated exterior enclosure solutions has expanded into cold-formed steel and bypass framing, interior prefabrication, kitted systems, BIM coordination and broader field construction capabilities. Klover’s teams continue to identify opportunities to move work off-site.

Every data center has different structural conditions, access constraints, labor requirements and schedule pressures. That is why Klover focuses on finding the right construction solution for each project. By connecting design, manufacturing and field execution, Klover helps mission-critical teams reduce uncertainty and create a more predictable path toward enclosure, interior construction, commissioning and turnover.

In data center construction, that certainty has value far beyond the jobsite.